After Travis or Jacob has input a project into SBS, take these steps

  1. Who is reaching out?
    a. New site = Jackie 
    b. Redesign = Jackie or Dakota (Jackie normally meets with any religious orders).

  2. In the Working Sites - On Deck folder in Dropbox, copy the Z Default Folders and rename the copy to site code. If redesign add *RD and the year to the end of the folder name. 
    1. Create a Dropbox request that links to the "Images-Provided" folder that is within the respective folder you copied. 
    2. Visit the Details tab of the project - past the dropbox request link in the respective field

  3. Project moves from New to Build only AFTER a consultation has been set
      a. Note dates in the Project Dates tab. Project Completion is likely 5-6 months from the consultation date - leave training and launch dates blank

  4. Before the meeting, review the Style Quiz Responses

  5.  

    Domain Lookup, whois.com  or https://lookup.icann.org/
     
    a. Note if the domain will stay put or transfer to our registrar, and the name of who will be the primary contact

  6. Input the contacts, etc, into the Domain Hopper

  7.  

    Send Client the timeline estimate at the end of the email, consider last consultation's dates, any date restrictions of the client, and the mockup / artwork timelines 
  8. Post Consultation Email Draft --- send to main contacts, or all those attending the consultation plus all of the Solutio BS team

  9. After the consultation
    a. A new clone can be created in FORGE. Usually we wait a month or two to allow any clone updates to be made as needed and batch multiple ones at a time.  (Because the default template used can change between the consultation and build, maybe wait to install the new template. )